Keep the battery pack of the starting motor at the starting voltage.
2. Keep the cooling water level of the radiator normal and the circulating water valve always open.
3. The crankcase oil level should be maintained within ±2cm of the mark on the dipstick.
4. The fuel tank is filled with more than half of the fuel and the fuel supply valve is always open.
5. The “Run – Stop – Auto” switch on the diesel generator control panel is placed in the “Auto” position.
6. The mode switch of the unit distribution panel is in the “Automatic” position.
7. Set the radiator fan switch to the “Automatic” position.
8. After receiving the signal of mains power failure, the unit starts up. Confirm the mains power failure, open the mains power switch of the conversion cabinet, close the power generation switch of the conversion cabinet, and start the intake and exhaust fans of the machine room.
For more questions about the generator set, please call the Beidou Power team. More than ten years of professional production and sales of power generation equipment experience, more professional engineer team to serve you, choose Beidou power is to choose rest assured, welcome on-site factory inspection.
Post time: Nov-19-2025
