Key points to note during the installation of diesel generator sets

Key points for installing diesel generator sets

 

11.2411.24

1. The installation site should have good ventilation. There should be sufficient air inlets at the generator end and good air outlets at the diesel engine end. The area of the air outlet should be more than 1.5 times that of the water tank.

 

2. The area around the installation site should be kept clean, and items that can produce acidic, alkaline or other corrosive gases and vapors should not be placed nearby. Fire extinguishing devices should be installed where conditions permit.

 

3. When diesel generator sets are used indoors, the exhaust pipes must be led outdoors. The pipe diameter must be greater than or equal to the diameter of the exhaust pipe of the muffler. The number of elbows connected to the pipe should not exceed three to ensure smooth exhaust. The pipe should be inclined downward by 5 to 10 degrees to prevent rainwater from entering. If the exhaust pipe is installed vertically upwards, a rain cover must be added.

 

4. When the foundation is made of concrete, a level must be used to measure its levelness during installation to ensure that the unit is fixed on a level foundation. There should be dedicated shock-absorbing pads or anchor bolts between the unit and the foundation.

 

5. The casing of the unit must have reliable protective grounding. For generators that require direct grounding of the neutral point, the neutral grounding must be carried out by professionals and lightning protection devices must be configured. It is strictly prohibited to use the grounding device of the municipal power supply for direct grounding of the neutral point.

 

6. The bidirectional switch between the diesel generator set and the municipal power supply must be highly reliable to prevent reverse power transmission. The wiring reliability of the bidirectional switch must be inspected and approved by the local power supply department.

 

For more questions about the generator set, please call the Beidou Power team. More than ten years of professional production and sales of power generation equipment experience, more professional engineer team to serve you, choose Beidou power is to choose rest assured, welcome on-site factory inspection.