Selection Of Diesel Generator Sets For High-rise Office Buildings

Because of the large number of residents, high-rise office buildings have a small amount of electrical appliances such as central air conditioners, elevators, water pumps, fans, lights, etc., which consume a lot of electricity. The capacity of the selected generator sets is generally hundreds of kilowatts or even thousands of kilowatts. kilowatt. High-level management office buildings are mostly office buildings, high-end shopping malls, hotels or high-end apartment buildings. They have high requirements on the quality of power supply service and the reliability and safety of power supply. We require uninterrupted power supply. Generally, it can be required within 1 to 3 minutes after the mains power failure. The normal power supply can be restored. Therefore, the rapid development of the emergency system for the unit is activated, and the emergency loading technical capability and reliability are very high. In such places, users mostly choose automatic diesel generator sets (self-starting generator sets). Most of the high-rise office buildings are located in the city center, the prosperous business district, geographical restrictions, most of the generator residential buildings are built at the bottom of the basement of the office building. The room space is small, and the supply of exhaust gas, smoke, and oil is difficult. In this way, the generator set is required to be small in size, light in weight, and easy to transport and install. Self-starting Cummins diesel generator sets are naturally the most frequently used generator sets for high-rise office buildings because of their small size, light weight, high level of automation, and high operational reliability.

Computer room design and installation: The computer room of the power generation system of high-level management office buildings has its particularity. Due to its own conditions, the computer room environment can generally be located in the basement of the enterprise building. A large amount of fuel is needed through storage. In order to enable the unit to develop and operate normally, the teaching design of the computer room and the correct selection and installation of the unit are particularly important. The unit should be placed in its own independent room and try to avoid close to the main power distribution. The machine side should be planned and designed as a whole according to the conditions of ventilation, oil supply, exhaust, and smoke exhaust. The computer room should make full use of the students’ operating technicians, and the operation, maintenance, and maintenance should be more convenient. The space required for time should be reserved. There should be at least 1.5m of space on both sides, and there should be a certain Chinese social height from the top to the ceiling. Information so that it can be disassembled for timely maintenance. The base of the unit should be able to bear enough. For basic research, the thickness of the cement material should be between 0.6 and 1.2m, and it should be about 0.5m above the ground. The base should be slightly larger than the base of the unit, about 0.15 on each side. m, and the four solid foundations of the platform should be built with sewage ditch, cable and pipe ditch. The wall near the radiator end of the unit must have an opening to allow the hot air discharged from the radiator to be discharged to the outside. The unit of the orifice area should be basically the same as the radiator area or slightly larger. The orifice should be aligned with the radiator, and try to make the hot air exhaust to the outside without being blocked by the wall. If there is a retaining wall outside the exhaust hole, the two will lack a certain horizontal distance between them, and the distance cost is about The height of the radiator.

8.18


Post time: Aug-18-2021